On the positive side, we sorted out why we thought we had paid a variation and they didn't... lets just say we are going to have the cost of the variation ($217.50) still left to draw out of our home-loan when the final claim is made.
Swung by the house today - no black plastic over any of the windows, and it looks like the internal painting is complete. I think all the painting that is left is the staining of the front timber (door and windows)... at least I hope so as they don't look like they have been painted yet. (-;
Anyway, enough with the boring blather, on with the pictures.
Update: We took the folks by today and I remembered to check if there was a solar panel on the roof to match the copper pipes sticking out of the wall - lo and behold there is! One more thing off the list.
(Click image for larger view)
The front... the gables and eaves are painted... and the downpipes are there; but not connected to the waste yet... I'm not sure if this is an improvement as the water just gets dumped closer to the house - but at least it is progress, and hopefully the plumbing will be connected soon.
Kitchen - yay the cornices made it before the painting finished.
(not that I was worried or anything)
(not that I was worried or anything)